Update dependency org.pitest:pitest-maven to v1.20.6 #144
Annotations
11 errors
mvn (ubuntu-24.04, 17)
Process completed with exit code 1.
|
mvn (windows-2022, 17)
The operation was canceled.
|
mvn (windows-2022, 17)
The strategy configuration was canceled because "mvn.ubuntu-24_04_17" failed
|
mvn (windows-2022, 11)
The operation was canceled.
|
mvn (windows-2022, 11)
The strategy configuration was canceled because "mvn.ubuntu-24_04_17" failed
|
mvn (ubuntu-24.04, 11)
The operation was canceled.
|
mvn (ubuntu-24.04, 11)
The strategy configuration was canceled because "mvn.ubuntu-24_04_17" failed
|
mvn (macos-15, 11)
The operation was canceled.
|
mvn (macos-15, 11)
The strategy configuration was canceled because "mvn.ubuntu-24_04_17" failed
|
mvn (macos-15, 17)
The operation was canceled.
|
mvn (macos-15, 17)
The strategy configuration was canceled because "mvn.ubuntu-24_04_17" failed
|