-
Notifications
You must be signed in to change notification settings - Fork 7
2025-06-28 shift for pp validation and OO cycle commissioning #192
New issue
Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.
By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.
Already on GitHub? Sign in to your account
Conversation
There was a problem hiding this comment.
Choose a reason for hiding this comment
The reason will be displayed to describe this comment to others. Learn more.
Pull Request Overview
This PR enhances the LHC 2025 logbook by introducing a new shift entry for Post TS pp Validation and OO Commissioning, adding a results visualization tip, and standardizing link formatting with target="_blank"
.
- Add a
!!! tip
section for results visualization - Reformat table rows and apply
target="_blank"
to external OP links - Insert new shift entry on 2025-06-28 with OP-only summary links
- Extend tooltips with two new activity descriptions
Comments suppressed due to low confidence (1)
Included MD14963 entry, split last saturday in 2 entries and adopted links from Ewen's PR at #193 Also aextracted the raw links to anchors down below the table as it was getting unreadable. |
Co-authored-by: Joshua Gray <[email protected]>
This is a little bit of an ugly entry, since:
I've made a single entry in the table that spans the full length of the shift.
There is a tooltip for each activity separately, and the links refer to the OP logbook summaries.
Tested links in local build, which are fine. To be decided if we want a different way to display this entry.