-
Notifications
You must be signed in to change notification settings - Fork 144
Pull requests: openshift/cluster-etcd-operator
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
Add priority field to prevent early shutdown
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#1476
opened Aug 29, 2025 by
CoreyCook8
Loading…
[release-4.19] OCPBUGS-61019: add individual context to the health check
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#1475
opened Aug 28, 2025 by
openshift-cherrypick-robot
Loading…
[release-4.19] OCPBUGS-60443: Vendor latest mixin, including additional and modified alerts for etcdDatabaseQuotaLowSpace
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
jira/severity-low
Referenced Jira bug's severity is low for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#1472
opened Aug 19, 2025 by
openshift-cherrypick-robot
Loading…
NO-JIRA: util and docs for quota testing
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
ETCD-590: configure probes based on quota size
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#1460
opened Aug 4, 2025 by
tjungblu
Loading…
OCPBUGS-48400: add bootstrap etcd removal sidecar
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
Use 0700 perms for etcd data dir
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#1441
opened Jul 4, 2025 by
shaneboulden
Loading…
[release-4.19] OCPBUGS-58339: Wait for 2 cp nodes before starting TNF jobs
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#1440
opened Jul 3, 2025 by
slintes
Loading…
centralize the integration cluster in a single package
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
lifecycle/rotten
Denotes an issue or PR that has aged beyond stale and will be auto-closed.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
WIP: tweak heartbeat interval, election timeout, and IO related timeout environment variables
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
lifecycle/rotten
Denotes an issue or PR that has aged beyond stale and will be auto-closed.
#1401
opened Mar 27, 2025 by
everettraven
Loading…
OCPBUGS-42810: actively move bootstrap member lead
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#1369
opened Nov 19, 2024 by
tjungblu
Loading…
ETCD-681: Add etcd-backup-server container within separate daemonset
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lifecycle/stale
Denotes an issue or PR has remained open with no activity and has become stale.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
tide/merge-method-squash
Denotes a PR that should be squashed by tide when it merges.
#1354
opened Oct 9, 2024 by
Elbehery
Loading…
2 tasks done
ProTip!
Exclude everything labeled
bug
with -label:bug.