-
Notifications
You must be signed in to change notification settings - Fork 136
Pull requests: metal3-io/ironic-image
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
Update openstack-ironic digest to b62ab06 (release-32.0)
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
✨ Allow IRONIC_IP, IRONIC_IPV6 and URLs to be derived from a DNS record
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#791
opened Nov 14, 2025 by
mchiappero
•
Draft
2 tasks
✨ Support both IPv4 and IPv6 addresses in startup scripts and configuration files
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#789
opened Nov 14, 2025 by
mchiappero
Loading…
2 tasks
⚠️ Improve priority and validation of input variables consumed in wait_for_interface_or_ip
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#788
opened Nov 14, 2025 by
mchiappero
Loading…
2 tasks
🌱 Small refactoring in the ironic startup scripts and template
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#787
opened Nov 14, 2025 by
mchiappero
Loading…
1 task
[PoC] Make ironic-image buildable with UBI-style base images
needs-rebase
Indicates that a PR cannot be merged because it has merge conflicts with HEAD.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#784
opened Nov 6, 2025 by
dtantsur
Loading…
add copilot-instructions.md
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
🌱 skip detection step with an explicit var when running IPE script
lifecycle/stale
Denotes an issue or PR has remained open with no activity and has become stale.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#710
opened Jul 4, 2025 by
pixelsoccupied
Loading…
ProTip!
Add no:assignee to see everything that’s not assigned.