The core DCM business process is executed by two roles and uses two APIs as well as two aspect models. The customer is responsible for `WeekBasedMaterialDemand`, the supplier for `WeekBasedCapacityGroup`. Within `WeekBasedCapacityGroup` the supplier has to link material demands.

|Function / Role|Customer|Supplier|
|-|-|-|
|Manage demand data|X||
|Inform supplier about demand|X||
|Manage capacity data||X|
|Link demand and capacity||X|
|Inform customer about capacity||X|
|Compare demand to capacity|X|X|
|Collaborate to resolve bottlenecks|X|X|
| Function / Role | Customer | Supplier |
|------------------------------------|----------|----------|
| Manage demand data | X | |
| Inform supplier about demand | X | |
| Manage capacity data | | X |
| Link demand and capacity | | X |
| Inform customer about capacity | | X |
| Compare demand to capacity | X | X |
| Collaborate to resolve bottlenecks | X | X |

## User Journey

```mermaid
journey
title Basic DCM User Journey
section Exchange demand
section Exchange demand
Manage demand:3: Customer
Provide demand data:3: Customer
Consume demand data:3: Supplier
Expand Down Expand Up @@ -213,7 +213,7 @@ Figure: *Material demand structure*
titlePadding: 10
titleFontSize: 20
showTitle: true
plotReservedSpacePercent: 50
plotReservedSpacePercent: 50
themeVariables:
xyChart:
backgroundColor: "#000000"
Expand All @@ -231,7 +231,7 @@ Figure: *Material demand structure*
---
xychart-beta
title "Example: Demand Data"
x-axis [Week 1, Week 2, Week 3, Week 4, Week 5, Week 6, Week 7, Week 8]
x-axis [Week 1, Week 2, Week 3, Week 4, Week 5, Week 6, Week 7, Week 8]
y-axis 0 --> 6000
bar [3000, 3000, 3000, 3000, 4000, 4000, 4000, 5000]
```
Expand Down Expand Up @@ -298,7 +298,7 @@ The customer is responsible for publishing capacity groups to their customer and
- Refresh the data at a minimum of once every four weeks.
- Align, ideally within a contract, the unit of measure for capacity quantities (e.g., pieces, kilograms, metric tons) with the Customer and utilize lead factors as conversion factors, if applicable.

The supplier must provide capacity data to the customer, corresponding to the material demand data previously shared. Thereby, the supplier is acting as a data provider and the customer as a data consumer of the exchanged capacity group.
The supplier must provide capacity data to the customer, corresponding to the material demand data previously shared. Thereby, the supplier is acting as a data provider and the customer as a data consumer of the exchanged capacity group.

The customer must have the capability to consume the capacity group data from the supplier.

Expand Down Expand Up @@ -356,7 +356,7 @@ Figure: *Capacity group structure*
titlePadding: 10
titleFontSize: 20
showTitle: true
plotReservedSpacePercent: 50
plotReservedSpacePercent: 50
themeVariables:
xyChart:
backgroundColor: "#000000"
Expand Down Expand Up @@ -427,7 +427,7 @@ config:
yAxisTickColor: "#F4F2F3"
yAxisLineColor: "#F4F2F3"
plotColorPalette: "#FFA600,#d91e18,#809500,#ffffff,#00ffff"
---
---
xychart-beta
title "Example 1"
x-axis [Week14, Week15, Week16, Week17, Week18, Week19, Week20, Week21, Week22, Week23]
Expand Down Expand Up @@ -489,7 +489,7 @@ config:
yAxisTickColor: "#F4F2F3"
yAxisLineColor: "#F4F2F3"
plotColorPalette: "#FFA600,#d91e18,#809500,#ffffff,#00ffff"
---
---
xychart-beta
title "Example 2"
x-axis [Week14, Week15, Week16, Week17, Week18, Week19, Week20, Week21, Week22, Week23]
Expand Down Expand Up @@ -535,7 +535,7 @@ config:
yAxisTickColor: "#F4F2F3"
yAxisLineColor: "#F4F2F3"
plotColorPalette: "#FFA600,#d91e18,#809500,#ffffff,#046b99"
---
---
xychart-beta
title "Example 3: Capacity Group with little Flexible Capacity"
x-axis [Week14, Week15, Week16, Week17, Week18, Week19, Week20, Week21, Week22, Week23]
Expand Down Expand Up @@ -577,7 +577,7 @@ config:
yAxisTickColor: "#F4F2F3"
yAxisLineColor: "#F4F2F3"
plotColorPalette: "#FFA600,#d91e18,#809500,#ffffff,#00ffff"
---
---
xychart-beta
title "Example 4a"
x-axis [Week14, Week15, Week16, Week17, Week18, Week19, Week20, Week21, Week22, Week23]
Expand Down Expand Up @@ -618,7 +618,7 @@ config:
yAxisTickColor: "#F4F2F3"
yAxisLineColor: "#F4F2F3"
plotColorPalette: "#FFA600,#d91e18,#809500,#ffffff,#00ffff"
---
---
xychart-beta
title "Example 4b"
x-axis [Week14, Week15, Week16, Week17, Week18, Week19, Week20, Week21, Week22, Week23]
Expand All @@ -636,27 +636,27 @@ Figure: *Visualizing capacity and demand*

A capacity group dataset comprises the following basic components:

| Main Parameters | Required? | Description |
|-|-|-|
| Supplier | Yes |The Business Partner Number Legal (BPNL) of the party providing materials to a customer|
| Customer | Yes |The Business Partner Number Legal (BPNL) of the party requesting material from a supplier|
| Capacity Group ID | Yes |The capacity group ID uniquely identifies the capacity group within the business relationship between a supplier and its customer|
| Changed At | Yes |Point in time when the content (any property according to the data model) of the capacity group was changed, at the supplier, either by a human user or an automated process|
| Capacity Group Name | Yes |Name of the capacity group|
| Capacity Group is Inactive | Yes |Indicates that this capacity Group is currently not in use/maintained by the Supplier|
| Unit of Measure | No |Unit of Measurement (UoM) for capacity quantities|
| Linked Demand Series | No |Set of demand series assigned to this capacity group|
| Capacities | No |A time series with week-based granularity along a given time period containing the capacity values|
| Unit of Measure is Omitted | Yes |Explicit indicator of whether the unit of measure is left out of the payload intentionally. If “true” it means the sending application sends the demand values without unit of measure intentionally and the unit of measure must not be contained in the payload. If “false” a unit of measure must be supplied|
| Main Parameters | Required? | Description |
|----------------------------|-----------|------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|
| Supplier | Yes | The Business Partner Number Legal (BPNL) of the party providing materials to a customer |
| Customer | Yes | The Business Partner Number Legal (BPNL) of the party requesting material from a supplier |
| Capacity Group ID | Yes | The capacity group ID uniquely identifies the capacity group within the business relationship between a supplier and its customer |
| Changed At | Yes | Point in time when the content (any property according to the data model) of the capacity group was changed, at the supplier, either by a human user or an automated process |
| Capacity Group Name | Yes | Name of the capacity group |
| Capacity Group is Inactive | Yes | Indicates that this capacity Group is currently not in use/maintained by the Supplier |
| Unit of Measure | No | Unit of Measurement (UoM) for capacity quantities |
| Linked Demand Series | No | Set of demand series assigned to this capacity group |
| Capacities | No | A time series with week-based granularity along a given time period containing the capacity values |
| Unit of Measure is Omitted | Yes | Explicit indicator of whether the unit of measure is left out of the payload intentionally. If “true” it means the sending application sends the demand values without unit of measure intentionally and the unit of measure must not be contained in the payload. If “false” a unit of measure must be supplied |

Further properties are added at lower level below the “Capacities” property. A capacity time series contains the following components.

| Main Parameters | Required? | Description |
|-|-|-|
| Actual Capacity | Yes |The actual capacity is the realistically planned output per calendar week and material for a specific customer in a specific unit of measure, considering all positive or negative impacts on this capacity|
| Agreed Capacity | No |The agreed capacity of a supplier for a specific customer material(s) within a capacity group. The agreed capacity must not constitute a legal obligation to deliver.|
| Maximum Capacity | Yes |The supplier's maximum capacity is the maximal available output per calendar week and material for a specific customer in a specific unit of measure. The maximum capacity thereby restricts the flexible capacity, as the flexible capacity is obtained from the difference of a suppliers maximum capacity minus actual capacity|
| Point in Time | Yes |ISO calendar week of the given time series entry. It must be given as a date of the Monday in the week.|
| Main Parameters | Required? | Description |
|------------------|-----------|------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|
| Actual Capacity | Yes | The actual capacity is the realistically planned output per calendar week and material for a specific customer in a specific unit of measure, considering all positive or negative impacts on this capacity |
| Agreed Capacity | No | The agreed capacity of a supplier for a specific customer material(s) within a capacity group. The agreed capacity must not constitute a legal obligation to deliver. Could be used to document a capacity agreed to by both parties, e.g. in a contract. |
| Maximum Capacity | Yes | The supplier's maximum capacity is the maximal available output per calendar week and material for a specific customer in a specific unit of measure. The maximum capacity thereby restricts the flexible capacity, as the flexible capacity is obtained from the difference of a suppliers maximum capacity minus actual capacity |
| Point in Time | Yes | ISO calendar week of the given time series entry. It must be given as a date of the Monday in the week. |

### Linking Capacity Groups to Material Demands

Expand Down Expand Up @@ -1031,6 +1031,25 @@ In order to facilitate collaboration with the Catena-X dataspace the DCM standar

For further details, please refer to [CX-0128 Demand and Capacity Management Data Exchange][StandardLibrary].

## Collaboration in multi-company scenarios

There are situations where multiple companies are involved in the DCM process. This section gives an overview of some potential cases/situations and how to handle them.

**Directed buy**: in this case a company (e.g. an OEM) asks its supplier A to buy parts from supplier B, whereas

- The purchasing contracts are in place between supplier A and B. The OEM has only a contract with supplier A.
- Following the Catena-X DCM process, supplier A creates demands and sends them to supplier B who replies with the corresponding capacity information.
- The OEM is not involved since the OEM is not part of the contract and therefore does not receive any data related to demand and/or capacity exchange between supplier A and B.

**Customer supplied material**: in this case, the customer (e.g. an OEM) orders part 1 at supplier A (Tier-2) and provides them to supplier B (Tier-1) to produce part 2 that is delivered to the OEM.

- If part 1 is delivered by supplier A to the OEM and then transported to the supplier B, for the Catena-X DCM process the OEM creates the demands and sends them to supplier A.
- In case part 1 is ordered by the OEM from supplier A but delivered directly to supplier B, for the Catena-X DCM process the OEM creates the demands and sends them to supplier A, indicating a delivery location BPNS belonging to supplier B.
**Contract manufacturing / cooperation plants**: in case of manufacturing plants co-owned by multiple companies or producing on behalf of other companies, a possible solution is to create the plant as BPNS for all manufacturers involved. For example, if a plant is co-owned by OEMs A and B, two BPNS can be created (one each for the BPNL of OEM A and B). That way, each OEM can send out his respective demand using his own BPNL and BPNS, avoiding confusion.
**Joint ventures**: joint ventures are often separate legal entities and are operated independently, therefore they would need to be onboarded to Catena-X as a separate BPNL with separate BPNS.

**Note**: in all cases, the demands need to be sent out by the company who orders the parts (i.e. is the purchasing party in the contract and pays for the parts).

## Notice

This work is licensed under the [CC-BY-4.0](https://creativecommons.org/licenses/by/4.0/legalcode)
Expand Down