  • Due by June 30, 2017
    1/1 issues closed
  • Short sprint focused on deploy, handover and wrapping up loose ends.

    Due by March 31, 2017
    1/2 issues closed
  • Results. This is the last sprint of this phase of work. The main deliverable is version 0.2.0 and includes: 1) scenario page with basic display of results; and 2) bug fixes and enhancements

    Due by March 29, 2017
    1/1 issues closed
  • Scenarios and road network editing. The main deliverable is version 0.2.0-alpha2. The sprint includes: 1) scenario management; 2) create first scenarios from the project data; 3) clone an existing scenario; 4) generate analysis for a scenario; and 5) edit the scenario road network using an iD-like editor

    Due by March 22, 2017
    16/16 issues closed
  • Scaffolding and project setup. The main deliverable is version 0.2.0-alpha1. This sprint includes: 1) set up repositories, continuous integration & Docker; 2) basic scaffolding of the pages; 3) visual design of the UI components; and 4) ability to manage project and upload project files

    Due by March 3, 2017
    7/7 issues closed
  • Due by December 31, 2016
    2/7 issues closed
  • Due by November 30, 2016
    8/12 issues closed