chore: add FUTURE_TIMEOUT to allow adjusting timeout
#1551
pr.yaml
on: push
compute-matrix
5s
Matrix: build-wheels-windows / build
Matrix: test-wheels-windows / tests
Matrix: build-conda / build
Matrix: build-wheels / build
Matrix: test-conda / tests
Matrix: test-simulator / test
Matrix: coverage-report / test
Matrix: test-thirdparty / test
Matrix: test-wheels-deps-wheels / test
Matrix: test-wheels / test
pr-builder
/
run
Annotations
2 errors
|
test-conda / 12.2.2, 3.11, arm64, ubuntu22.04, a100, latest-driver, latest-deps
The job has exceeded the maximum execution time of 1h0m0s
|
|
test-conda / 12.2.2, 3.11, arm64, ubuntu22.04, a100, latest-driver, latest-deps
The operation was canceled.
|