Skip to content

Comparing and summing isochrones #12

Description

@wacekk

As I wrote in another issue, I am looking for a method for comparing isochrones generated using spNetwork (e.g. comparing two design variants). The road network in both cases will not necessarily be identical, it may differ, for example, by a built-up road. However, I assume that the vast majority will be identical (which allows individual sections to be assigned the same ID).

I am also interested in summing up - calculating the total travel time, e.g. to school and back, taking into account one-way streets. I am able to generate a network "to" and "from" by artificially changing the direction of one-way roads.

Of course, other operations than calculating the minimum, maximum (calculating the maximum distance traveled in the morning or afternoon) or summing (analyzing the path to and from a point) and subtracting (comparing variants) do not make sense on isochrones.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions