Skip to content

Things to do after a ZEP gets accepted #44

@sanketverma1704

Description

@sanketverma1704

Hi all. 👋🏻

I'm creating this issue to track tasks that need to be done after a ZEP is accepted. They are:

  • Change the status from draft to accept, and add the link for the voting issue
  • Add the date of acceptance in the ZEP header
  • Move the ZEP from draft to accepted
  • Changed the status in the specification document hosted at https://zarr-specs.readthedocs.io/
  • If there is a DRAFT watermark in the background, remove it

I'll be adding these in the ZEP0000, once the list is complete.

Please let me know if I missed anything. Thanks!

CC: @zarr-developers/implementation-council @zarr-developers/steering-council

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions