Implement CLI consolidation, Smart HITL, and TTY formatting #288
ci.yml
on: push
acceptance-p0
28s
use-case-matrix
25s
test-telemetry
19s
lint
20s
package
21s
Matrix: test
acceptance-all
45s
Annotations
7 errors
|
lint
Process completed with exit code 1.
|
|
acceptance-all
Process completed with exit code 1.
|
|
test (3.11)
Process completed with exit code 1.
|
|
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
|
|
test (3.10)
The operation was canceled.
|
|
test (3.12)
The strategy configuration was canceled because "test._3_11" failed
|
|
test (3.12)
The operation was canceled.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
use-case-matrix
|
1.5 KB |
sha256:ff0c2eb433da43153269c8aa09f3fc82d50a3c42405441aa32b25a687c03f920
|
|