Skip to content

chore(deps): update dependency node-gyp to v12 #4687

chore(deps): update dependency node-gyp to v12

chore(deps): update dependency node-gyp to v12 #4687

Triggered via pull request November 14, 2025 05:13
Status Cancelled
Total duration 27s
Artifacts

dockertests.yml

on: pull_request
win-tests
22s
win-tests
Matrix: linux-dockertar-tests
Matrix: linux-tests
Matrix: os-tests
Fit to window
Zoom out
Zoom in

Annotations

12 errors
linux-dockertar-tests (ubuntu-24.04)
Process completed with exit code 1.
os-tests (ubuntu-24.04)
Process completed with exit code 1.
linux-tests (ubuntu-24.04)
Process completed with exit code 1.
linux-dockertar-tests (ubuntu-24.04-arm)
The strategy configuration was canceled because "linux-dockertar-tests.ubuntu-24_04" failed
linux-dockertar-tests (ubuntu-24.04-arm)
The operation was canceled.
os-tests (ubuntu-24.04-arm)
The strategy configuration was canceled because "os-tests.ubuntu-24_04" failed
os-tests (ubuntu-24.04-arm)
The operation was canceled.
linux-tests (ubuntu-24.04-arm)
The strategy configuration was canceled because "linux-tests.ubuntu-24_04" failed
linux-tests (ubuntu-24.04-arm)
Process completed with exit code 1.
docker tests
Canceling since a higher priority waiting request for docker tests-2778 exists
win-tests
Canceling since a higher priority waiting request for docker tests-2778 exists
win-tests
The operation was canceled.